-
The efficiency of the all the Air washer and Air Handling unit to be studied.
-
The blower efficiency, air delivery, humidification and deviation from the rated efficiency of the equipments
-
The humidity, air changes and the temperature requirement to be studied in the plant and compare with the existing requirements.
-
Air balancing to be checked and suggest measures to maintain the same.
-
Study of losses in the air distribution system i.e. ducts layout to be studied to analyze the pressure losses.
-
The scope of improvements in the overall performance to be explored and suitable recommendations to be made.
|